Bear Mountain Trails Project

The New York-New Jersey Trail Conference is rebuilding the Appalachian Trail over Bear Mountain in NY state. This blog will help keep our volunteers and members informed on the work being completed!

Friday, October 12, 2007

Want to Learn More Skills? Attend one of our Upcoming Workshops!

Late Fall 2007 Trail University Workshops at Bear Mountain

Contact: Leslie Rapparlie (rapparlie@nynjtc.org) for more information (201) 512-9348 x 28

Trail Construction: Building Over Bedrock: The art of stone pinning
Dates: October 26-29th (come out for all days or for just the weekend)
Instructor: Peter Jensen
Close to where the new AT route joins the old, the trail will wrap around a ridge which is a smooth bedrock ledge for nearly 60 linear feet. Here, for these four days, crews will be anchoring a two to three foot tall crib wall onto numerous steel pins for that entire length while enjoying leafless views down onto the Bear Mountain Bridge, Anthony’s Nose, and the Hudson River. Most quarrying will be done prior to the weekend. Allowing participants a unique opportunity to learn and perfect skills. Participants must have volunteers on stone work trail crews before and get permission to participate from Construction Manager or the General Project Manager (see above).

Trail Construction: Stone Step Construction for Beginners
Dates: November 3rd and 4th
Instructors: Jon Paulson, former SCA crew leader and Yosemite National Park Trail Crew Member
Participants will learn how to build stone steps on the western side of Bear Mountain, a short distance from the Summit Tower. Several different methods will be employed to build a two foot’ wide stone staircase in beginner-friendly terrain on the mountain’s gentler south side. Instruction and tips will be given to safely move stone with minimal effort and impact to the environment.

Advanced Trail Construction: Stone Crib Wall Construction
Dates: November 10th and 11th
Instructors: TBD
If you missed these workshops in the fall or in year one, this may be your last chance in a while as the 2008 season has mostly stone steps planned. Participants in this workshop will learn to build dry stack stone retaining walls (a.k.a. crib walls). In addition to key structural and design requirements, participants will also learn how to use stone shaping tools to cut rock to desired shapes and sizes.

Advanced Trail Construction: Stone Cutting and Shaping
Dates: November 17th and 18th
Instructors: Eddie Walsh and Matt Townsend
This will be the inaugural workshop to take place in the dramatic “boulder fields” uphill of Hessian Lake. Stone cut and split during this workshop will be used as five foot wide stone steps that wind between bus-sized boulders and under dramatic rock ledges. By learning how the stone prefers to break, participants in this classic Bear Mountain workshop spend time learning how to split boulders into usable steps and smaller boulders as well as how to delicately shape stone.




Advanced Trail Construction: Stone Paving
Dates: December 1 and 2
Stone Paving, also called rip-rap, or pitching, is a technique used to create a durable walking surfacing that can withstand heavy water flows. On Bear Mountain it is used below large rock slabs and in areas where intermittent streams flow through a wide area of hillside. Essentially, it is the construction of a stone patio like structure across the walking surface. Tools used include basic rock moving tools, shaping tools and occasionally rock saws. This work differs from other construction work on the mountain in that the stones used are usually smaller and easier to handle.


Advanced Trail Skills: Rigging and Highline Basics
Dates: December 1 and 2
Learn the basic safety and operational methods of using highlines to move large stones. This workshop will take place in the lower boulder fields above Hessian Lake, weather permitting.